
Nuclear submarine HMS Vengeance of the Royal Navy has returned to Scotland after a 217-day underwater mission, breaking the previous record of 205 days set by HMS Vanguard in April. According to experts, these two consecutive records do not indicate the strength of the Royal Navy, but problems within the nuclear submarine fleet, Euronews writes.
The increasingly long duration of missions is linked to delays in completing maintenance on aging submarines and to severe psychological pressure on personnel, according to experts cited by Euronews. Nuclear submarine specialist David Cullen told the British daily The Guardian on 15 November that Vanguard-class submarines were originally designed for missions of about three months.
Cullen added that even this period was seen as a long time to stay “underwater in a metal box with no contact with the outside world.” Vanguard-class submarines, which carry a crew of about 140 people, initially carried out missions of three to four months. In the past, even 100-day missions were rare, while today some patrols are said to last more than twice that time.
Longer missions mean that already cramped submarines must carry larger quantities of food and other supplies. The crew must live for months on end alongside additional supplies stored in corridors and in any other usable space. The British government links the lengthening of missions to budget cuts, which, it says, have slowed submarine maintenance work. ## HMS Vengeance and the nuclear submarine fleet HMS Vengeance, launched in 1998, is one of Britain’s four Vanguard-class nuclear submarines.
About 150 metres long and weighing 17,526 tonnes, the submarine is designed to carry Trident ballistic missiles. There are 16 missile launch tubes on board. Trident missiles can carry multiple nuclear warheads that can be directed at different, independent targets.
This technology is known as “multiple independently targetable re-entry vehicle” (MIRV). Vanguard-class submarines are at the centre of Britain’s nuclear deterrence strategy. Under the Royal Navy’s policy of continuous at-sea deterrence, at least one nuclear-armed submarine is always on patrol.
The aim of this strategy is to ensure that, even if other British military infrastructure were severely damaged in a major attack, the country could still respond with nuclear weapons from the sea. However, fleet submarines that spend long periods in maintenance increase the burden on the vessels that are available to be deployed at sea.
Service on nuclear submarines is considered one of the most psychologically demanding duties in the Royal Navy. Ballistic missile submarines such as HMS Vengeance spend most of their missions submerged and under radio silence to avoid detection of their position.
Although submarines can, when necessary, move to shallower depths and communicate via special antennas, contact between the crew and the outside world is extremely limited. Sailors can receive messages from their families once a week, no more than 120 words, known as “Familygrams”.
However, these messages are reviewed by navy officials before they are passed on to the crew. Officials may censor bad news or sensitive information that they believe could harm the performance of personnel on duty. In addition, sailors are not allowed to reply to their families’ messages.
As a result, crew members may remain for months without knowing about major developments in their families, or may be powerless to respond to the news they receive. Working conditions in the British submarine fleet have also been in the news over allegations of harassment and discrimination against female personnel. ## Harassment allegations and the future of the fleet In 2022, Sophie Brook, one of the first female members of the Royal Navy’s submarine crew, said she had experienced persistent sexual harassment during her service.
After Brook’s account, other women in service shared their experiences with the public. In 2024, the then head of the Royal Navy, Admiral Sir Ben Key, apologised, describing misogyny in the submarine service as intolerable. HMS Vengeance’s record mission has also added to concerns about the future of Britain’s nuclear fleet.
Vanguard-class submarines were originally designed for a service life of about 25 years. However, delays in bringing the new generation of submarines into service mean that existing vessels are expected to operate for about 40 years. The first submarine of the new Dreadnought class, HMS Dreadnought, is expected to enter service around 2032.
