
Prime Minister Edi Rama has announced the completion of works on Lot 2 of the Papër–Ura e Grykshit road, in the Elbasan district.
Through a social media post, Rama published footage from the completed section, which includes a 330-metre-long bridge.
According to the prime minister, the investment aims to increase road safety and facilitate connections between areas.
“Lot 2 of the Papër–Ura e Grykshit road, Elbasan, is now complete, including a 330-metre-long bridge. Another investment that increases road safety and facilitates connections between areas”, Rama wrote.