Bozhinovska: Gas Interconnector with Greece to Be Completed by Mid-2027, Serbia Link Planned for 2028
Minister Sanja Bozhinovska announced at the CESEC ministerial meeting in Zagreb that the Macedonian segment of the gas interconnector with Greece is expected to be completed by mid-2027, while the link with…